PDA

View Full Version : project now in full swing



Sheepie
12-08-2007, 18:35
As some of u already know my s13 that has been in the garage for 3 and a half year is now starting to go somewhere it now has a full mot and the engine
has now been removed wwwwooooohoooo so now time for the rebuild or replacement engine will say more shortly as short of time at mo lol

Sheepie
19-08-2007, 17:17
right i need a replacement engine anyone got one?
at mo trying to get flywheel of whats the best way of jaming it?

fcuk1_6
15-10-2007, 12:12
ur heep still not running?

Jeffers_S13
15-10-2007, 12:17
right i need a replacement engine anyone got one?
at mo trying to get flywheel of whats the best way of jaming it?

Is the head still on ? Put a bolt through a spare threaded hole in the head and put the ring end of a spanner over it, you can do it with a hole in the block but its easy using the head. Wedge the open end of the spanner over one of the clutch cover locating dowels against the direction you are trying to undo IYSWIM. Undo the front pulley before your remove the flywheel usi8ng this method (unless you loosened it whilst it was in the car).